Tim BONDO HVAC/R Evacuation Quiz May 22, 2022, 5:07 pm

Related Tech Tips

Double Lugging, A Common Mistake
Connecting more than one wire on or under a single lug or connection point is called “double lugging,” and it is ONLY allowed in line voltage wiring under one condition, according to NEC 110.14: If the terminal, lug, or connector is specifically rated for more than one wire In the case of a conductor splice, […]
Read more
The Case for Checking the Charge Without Using Gauges
Jim Bergmann and I recorded a podcast for HVAC School that covered when and how to check the refrigerant circuit without connecting gauges. Listener Joe Reinhard listened several times and wrote up this summary of what he gained from the episode. I edited it lightly, but most of this is his work. Thank you so […]
Read more
Changing Liquid Filter/Drier Cores Tip
This tip comes from market refrigeration and controls technician Kevin Compass. Thanks, Kevin! A little tip when changing liquid cores: If you start pumping them down, begin bypassing discharge gas into the shell to warm it up, push out the remaining liquid, and bring the shell above the dew point so that it doesn't sweat […]
Read more

Leave a Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

loading

To continue you need to agree to our terms.

The HVAC School site, podcast and daily tech tips
Made possible by Generous support from