HVAC/R Evacuation Quiz July 1, 2022, 7:35 pm

Comments

Related Tech Tips

Equipment Grounding
The grounding and bonding process is important, and it's a fairly broad topic. In HVAC/R, we generally just need to make sure that we properly connect the conductors (wires) provided to the proper connection points in the equipment and occasionally the disconnects. These connection lugs or green screws are rated for grounding so long as […]
Read more
ECM, VFD, and Inverter - What's the Difference?
Ever since Nikola Tesla invented the modern induction motor, we have been struggling with varying the speed of motors efficiently and reliably. The trouble in the HVAC industry is that there are several different types of technologies in play, and they can easily get confused. ECM (electronically commutated motor) In residential and light commercial HVAC, […]
Read more
Stacking Evaporator Coil Stages
In commercial HVAC, you will find several different types of multi-stage evaporator coils: intertwined (shown above), horizontal face split (one coil on top of another), and vertical (side by side). When staging a horizontal evaporator, pay attention to ensure that stage #1 is on the bottom and stage #2 is on the top. If stage […]
Read more
loading

To continue you need to agree to our terms.

The HVAC School site, podcast and daily tech tips
Made possible by Generous support from