In this short podcast, Bryan answers a listener-submitted question about duct smoke detector facts and wiring. He focuses on Honeywell duct smoke detectors (namely the D4120W), but there are some general best practices that can be applied to most duct smoke detectors.

The power supply may be 24v or 120v AC or DC and may have multiple inputs. You should not break that constant power source. There are also fan shutdown contacts, which may be normally open (alarm condition) or normally closed (non-alarm condition). Supervisory contacts open to indicate a trouble condition to the panel when something in the circuit isn’t working properly (NOT an alarm condition). There is often a resistor at the end of the loop, and the alarm panel recognizes a specific resistance. Alarm initiation contacts close and create a shorted condition when there is an alarm condition (the supervisory contacts open if there is a trouble condition).

Smoke detectors in the ducts are different from the ones on ceilings; they usually shut down blowers to prevent the distribution of smoke through the ductwork (and possibly exhaust it to the outside). They are required in duct systems designed for more than (or at least) 2000 CFM per NFPA90 and IMC 606.2.1, though those codes conflict. NFPA90 requires installation in the supply duct, but IMC 606.2.1 requires installation in the return; the AHJ may interpret the code either way. (Smoke detectors in systems >15000 CFM must be in both the return and the supply.)

Overall, remember that different detectors are suitable for different velocities. You will want to keep them downstream of bends for at least 18 inches, test them according to the AHJ, and ensure that they are mounted in the right configuration as recommended by the manufacturer.

Have a question that you want us to answer on the podcast? Submit your questions at https://www.speakpipe.com/hvacschool.

Purchase your tickets or learn more about the 6th Annual HVACR Training Symposium at https://www.hvacrschool.com/symposium.

Subscribe to our podcast on your iPhone or Android.

Subscribe to our YouTube channel.

Check out our handy calculators here or on the HVAC School Mobile App for Apple and Android.

Work through this with the trade.

Highlight a short passage, or bring a question about a specific moment into HVAC No Bull Forum.

Discuss this reference → Related forum discussions

Comments

Deliver High Performance Heat Pump Retrofits w/ David Richardson
Did You Actually Test Every Heat Strip – Short #311
Uncovering the Root Causes of Commercial Refrigeration Failures
Why and How to Test Heat Pump Defrost – Short #310
Building a Business That Lasts: Why Culture Beats Strategy in HVACR w/ Tony Gonzalez
Tight Enough to Fail – Short #309
Glycol Skids for Market Refrigeration w/ Max Johnson
Your Thermostat Is Reading the Wall – Short #308
Next-Gen Filtration – Pressure Drop, MERV 16, and Bypass Prevention w/ Chris Howells
The Fuse Only Blows When You Leave – Short #307

Author:

To continue you need to agree to our terms.

The HVAC School site, podcast, and tech tips are
made possible by generous support from